Blackberry Hill Farm
Thurman, NY

The Agriculture Environmental Management (AEM) Farm of the Year recognizes farmers who excel in the stewardship of water quality and natural resource protection and improvements on their working lands. The 2025 winner, Blackberry Hill Farm, is a 24-acre property established in 2014 in the Town of Thurman. This farm focuses on producing a diverse range of mixed vegetables and fruits during the growing season, along with raising livestock such as goats, cows, pigs, turkeys, horses, ducks, and chickens. For three consecutive years, Blackberry Hill Farm held organic certification for its vegetables, herbs, meat chickens, and turkeys. In 2016, the farm further enhanced its operations by installing a 30×96 ft high tunnel to extend the vegetable growing season. More recently, Blackberry Hill Farm has expanded its market to include baked goods, building a 20-C industrial food processing facility and storefront on the property in 2021.
Over the past eight years, the farm has actively participated in the AEM Program, engaging in various conservation practices and sustainably growing its agricultural output. This includes implementing soil tests, high tunnel installation, and engineered stormwater projects while continuously enhancing their knowledge of sustainable agriculture. In 2021, in collaboration with the AEM Program, Blackberry Hill Farm began planning a farm access road stabilization project aimed at addressing persistent erosion, stormwater runoff, and access road challenges. Early in 2023, a joint effort involving the Warren County Soil & Water District, an engineering firm, a contractor, and the farm owners resulted in the development of an engineered access road design focused on significant stormwater improvements. The project aimed to improve 600 feet of primary access roads while allowing for the refinement of stormwater practices during construction. By May 2025, the project was ready for implementation, with key construction elements including the stabilization of primary access roads, grading for stabilized ditches, and the creation of two stormwater retention areas. Additionally, a 350-foot bioswale was installed, featuring a series of check dams and a 100-foot membrane liner for wellhead protection. A new parking area near the farm building was also graded to manage runoff efficiently, along with an unloading pad for farm deliveries that drains to the bioswale. The project included the installation of a buried water line for artesian well overflow and upslope grading to mitigate stormwater runoff from steep areas, including the high tunnel.
To safeguard the soils during construction, various erosion and sediment control measures were employed, including compost filter socks, rolled erosion control products, hydroseeding, hand seeding, mulching, and silt fences. Blackberry Hill Farm has a strong commitment to enhancing its agricultural infrastructure and the long-term protection of natural resources. Blackberry Hill truly deserves this award for the incredible hard work and passion they put into conservation. Their dedication is inspiring and deeply appreciated.